Floor Flatness Analysis

The Challenge

In developing a site for an e-commerce company in the Las Vegas metro area, our client was tasked with delivering a 650,000-square-foot, cross-dock facility, where materials are unloaded from incoming semi-trucks and loaded directly onto outbound trucks with little or no storage between.

 

The challenge was to deliver a high-quality facility that met client and tenant expectations while adhering to a very aggressive timeline. At the same time, our client needed to reduce spend on reconciling clashes in the field — clashes with the potential to amass change orders totaling hundreds of thousands of dollars.

 

The Solution

Providing BIM/VDC services, ZELUS assisted in lead coordination, with an emphasis on coordination with the shell and structural components of the facility. Highly accurate 3D models identified design and construction issues early in the processes, particularly clashes with structural elements, sprinklers, rigid ducts, and electrical panels. After just four weeks of coordination services, the 3D models helped reveal nearly 70 coordination issues.

 

To learn more about our process for Clash Detection ask about our [Z]Verify software!

Request a Consult

Scope

Conduct a Floor Flatness Report

General Contractor

Catamount Constructors

Square Foottage

327,000

Purpose of Scans

Addition of robotics

Deliverables

Shop Drawings
Floor Flatness Report
Registration Services
Specified Gloss Value Report
Forensic Analysis
Dry Coefficient of Friciton Report